Director of Business Development, Data Centers

$200k - $450k

Workplace
Remote ok
Employment
Full-time

About this role

Compensation
OTE $200k–$450k, heavily commission-based on closed deals, plus competitive equity. Reports directly to the CEO. Anywhere in the US, with travel expected.

Why this matters
Communities are pushing back on data centers, and water is one of the biggest reasons. To advance AI infrastructure alongside the communities that host it, we need a new, flexible and fast on-the-ground way to supply water.

About Aquaria
Aquaria builds modular systems that make water from air. We’ve deployed 500+ systems and produced 7M+ gallons. We’re now building toward the world’s first zero-aquifer data centers, supplied by water from the air instead of the community’s supply. HydroGrid brings that to infrastructure scale for data centers, and HydroPak delivers water for the communities around them.

The role
You’re a senior, hands-on builder who personally creates and runs Aquaria’s data center business nationwide from day one. You find the right accounts, get in the room, win the technical review, and carry each opportunity through to signed commitments, pilots and delivery. Our public-affairs partner opens doors and supports regulatory and community strategy; you own every step after the intro.

You’re semi-technical and commercially relentless. You understand how data centers are designed, permitted, cooled and procured well enough to earn trust with facilities, MEP and sustainability teams, and you close with the developers and operators who make the call. You use AI to move fast and measure yourself by signed results.

What you own
- The national data center pipeline end to end: hyperscalers, colocation operators, developers, and the engineering, EPC and community stakeholders around each deal.
- Turning interest into site-specific proposals, LOIs, paid pilots and signed agreements across HydroGrid and HydroPak.
- The technical sales conversation (integration, uptime and redundancy, heat and energy, water yield, install), with our engineers alongside you when needed.
- A clear map of each account’s buying path: who writes the standard, who permits the site, who owns CapEx and OpEx, and who signs.
- Close coordination with the CEO, public affairs, product and engineering, plus a forecast that reflects reality.

Your first six months
First 30 days
- Learn the product, the data center water problem and the live pipeline well enough to lead customer meetings.
- Build a ranked national account list with named stakeholders and a path to close for each.
- Turn current conversations into site-specific next steps.

First 3–6 months
- Run a repeatable first meeting, NDA and technical review process with the materials technical buyers need.
- Land the first signed commitments that prove demand, such as LOIs, paid pilots or delivery agreements, with a clear path to HydroGrid deployment.
- Bring operator requirements back into the product so we build what gets specified and approved.

Must-haves
- A proven record of selling or advancing complex cooling, water, thermal, power or mission-critical infrastructure into data centers or a close neighboring industry.
- Enough technical depth to lead a skeptical engineering meeting.
- Long, multi-stakeholder deals personally carried to a signed outcome.
- Ownership of the full cycle: you write the brief, run the meeting, send the follow-up and keep the forecast honest.
- High agency, high output and a willingness to travel.
- A personal commitment to making data center growth work for communities and their water.

Nice-to-haves
- Experience at a cooling, water-treatment or power OEM, or inside a hyperscaler, colo or developer.
- Familiarity with procurement and vendor qualification, such as approved-vendor lists, RFQs and supplier onboarding.
- Experience with permitting, community or regulatory work around water, land or energy.
- A national network among data center developers, operators and MEP firms.
- Fluency with AI tools.

Signals of the right person
- They can walk through a real deal: who was in the room, what almost stopped it, and how they got it signed.
- They speak in site-specific terms, such as water source, permits, cooling design and timeline.
- They’ve personally done the work.
- They push for more quality touches and tighter conversion.

OTE $200k–$450k, heavily commission-based on closed deals, plus competitive equity. Reports directly to the CEO. Anywhere in the US, with travel expected.

Apply to Aquaria

Clera fills in Aquaria's application for you.

How it works

Open the role in Clera

Sign in, and this role opens on your Clera job board, ready to apply.

Clera fills in the application

Clera fills the form from your profile and resume, and asks what's missing.

Track it in Clera

Each application you send shows up in your Clera tracker, sorted by stage.

Want Clera to find roles for you?

Ask your AI about this role

It knows you. Clera gives it the role.

Does this role fit my profile?

First time? Connect Clera once, about a minute.
One click above pre-fills the connector. Or by hand: Settings > Connectors > Add custom connector, paste https://mcp.getclera.com. Either way, sign in with the account you use on Clera and approve the consent screen.
https://mcp.getclera.com

Sign in with your Clera account. MCP docs

About Aquaria

Aquaria taps into the humidity in the air as a new and renewable source of water. Our mission is to safeguard access to water against droughts and other effects of climate change.

Aquaria's atmospheric water generators (AWGs) act as a backup or alternative watery supply that can be installed on-site in hours. Aquaria puts control back to the consumers, crucial for those who are facing water stress challenges, access challenges, or contamination.

Team size
11-50 employees people
Founded
2021
Industry
Climate Technology Product Manufacturing
Workplace
Remote ok
Locations
United States

Benefits

  • Competitive equity
  • Commission-based compensation