Research co-op

Location
Burnaby, British Columbia
Workplace
On-site

About this role

Ballard Power Systems requires a co-op student (8 month term) in the MEA Engineering and Research team to assist in the research activities associated with the development of membrane electrode assembly (MEA) for current fuel cell designs and the next generation of Ballard fuel cell products. MEAs are the crucial part of fuel cells, and the student will have opportunities to work with its different components and learn what is happening in the exciting field of fuel cells.
 
Responsibilities:
The student will be responsible for:
  • Conducting component/material properties measurements and characterization testing
  • Preparing test samples and maintaining test stations
  • Running fuel cell diagnostic testing procedures to evaluate fuel cell performance and durability
  • Performing early failure analysis and accelerated stress testing to understand the degradation phenomena
  • Analyzing and presenting test results
Requirements:
Students from the following disciplines are appropriate for this opportunity:
  • Mechanical Engineering
  • Chemical Engineering
  • Materials Engineering
  • Engineering Physics
  • Mechanical Engineering
  • Integrated Engineering
  • Electrical Engineering
  • Chemistry
  • Physics
Key skills include:
  • Ability to work in the lab, be very “hands on” and detail oriented
  • Data analysis using Excel and data presentation
  • Strong oral and written communication ability
  • Basic understanding of fuel cell operation is an asset
  • A working knowledge of programming (Python and VBA preferred) would be an asset for side projects
Ballard values diversity in the workplace and is committed to Employment Equity.  We encourage applications from all qualified candidates.

Apply to Ballard Power Systems

Clera fills in Ballard Power Systems's application for you.

How it works

Open the role in Clera

Sign in, and this role opens on your Clera job board, ready to apply.

Clera fills in the application

Clera fills the form from your profile and resume, and asks what's missing.

Track it in Clera

Each application you send shows up in your Clera tracker, sorted by stage.

Want Clera to find roles for you?

Ask your AI about this role

It knows you. Clera gives it the role.

Does this role fit my profile?

First time? Connect Clera once, about a minute.
One click above pre-fills the connector. Or by hand: Settings > Connectors > Add custom connector, paste https://mcp.getclera.com. Either way, sign in with the account you use on Clera and approve the consent screen.
https://mcp.getclera.com

Sign in with your Clera account. MCP docs

About Ballard Power Systems

Ballard Power Systems (NASDAQ: BLDP; TSX: BLDP) is a global leader in zero-emission hydrogen energy solutions and an integrated Energy-as-a-Service (EaaS) provider. Together, with its wholly owned subsidiary, GeoPura Ltd., Ballard delivers turnkey, vertically integrated hydrogen ecosystem solutions spanning hydrogen production, logistics, refuelling, zero-emission fuel cell engines, and stationary Hydrogen Power Units.

Ballard powers critical off-grid, stationary applications - including construction, events, film sets, healthcare, defense, temporary power infrastructure, and supplies fuel cell engines for heavy-duty mobility applications such as bus, rail, and marine. With an EaaS model, combined with cutting-edge technology across the hydrogen value chain, Ballard decarbonizes mission-critical operations worldwide.

To learn more about Ballard, visit www.ballard.com.

Team size
501-1,000 employees people
Founded
1979
Industry
Fuel Cell Manufacturing
Workplace
On-site
Locations
Burnaby, British Columbia, Canada