Engineer II - T/S
- Location
- Juno Beach
- Workplace
- On-site
- Employment
- Full-time
About this role
Requisition ID: 98961
Florida Power & Light Company is the largest electric utility in the U.S., providing reliable energy to nearly 12 million Floridians. With one of the nation’s most fuel-efficient, cost-effective power generation fleets and industry-leading reliability, we’re redefining what’s possible in energy. Want to be part of something powerful? Join our outstanding team and help shape the future of energy.
Position Specific Description
The Engineering Construction & Supply Chain (ECSC) and FPL Transmission & Substation team is seeking an Engineer II to lead the engineering and execution of high-voltage projects from power plant switchyards to distribution substation high buses. As an Engineer II, you will work on managing projects from scoping through construction and commissioning. In this role, you will lead external Engineers of Record (EORs) and consultants that design large substation projects throughout FPL territory.
Apply to Florida Power & Light
Clera fills in Florida Power & Light's application for you.
How it works
Open the role in Clera
Sign in, and this role opens on your Clera job board, ready to apply.
Clera fills in the application
Clera fills the form from your profile and resume, and asks what's missing.
Track it in Clera
Each application you send shows up in your Clera tracker, sorted by stage.
Ask your AI about this role
It knows you. Clera gives it the role.
First time? Connect Clera once, about a minute.
https://mcp.getclera.comSign in with your Clera account. MCP docs
About Florida Power & Light
Florida Power & Light Company (FPL), a subsidiary of NextEra Energy, Inc. (NYSE: NEE), is the largest electric utility in America and provides affordable, reliable and clean electricity to over 12 million people in Florida.
FPL's commitment to reliability is exemplified by our recognition as the winner of the ReliabilityOne® National Reliability Award seven times in the past eight years.
Learn more about us at www.FPL.com.
Interested in becoming a part of our team? Visit https://jobs.nexteraenergy.com/ to apply today!
- Team size
- 5,001-10,000 employees people
- Founded
- 1925
- Industry
- Utilities
- Workplace
- On-site
- Locations
- Palm Beach County, Florida, United States