Global Graduate Program 2026-Algorithm Engineer

Workplace
On-site
Employment
Full-time

About this role

Job Responsibilities: 
1. Engage in wind turbine & wind farm design and cutting-edge wind energy R&D to develop advanced products, including but not limited to:
a. Develop, verify and promote advanced standalone wind turbine control strategies;
b. Research and develop wind farm cluster control and energy optimization technologies;
2. Design integrated solutions for major domestic & international wind farm projects to boost competitiveness, including but not limited to:
a. Deliver competitive solutions per project requirements;
b. Plan and implement advanced turbine control strategies based on market demands;
3. Analyze turbine performance and resolve issues to ensure full-lifecycle safe operation, including but not limited to:
a. Prototype testing and stability assurance: identify modal frequency, pitch & converter response, unit loss, etc.;
b. Analyze operational performance, formulate solutions and complete closed-loop verification;
c. Summarize operational issues and iterate advanced control technologies;
Career path: Wind energy technical expert, turbine system expert & solution expert.

Qualifications: 
1. Master's degree or above, major in Automation, Mechanical Automation or Electrical Automation;
2. Proficient in relevant software;
3. Experience in leading or participating in research & collaborative projects preferred;
4. Excellent oral & written English for daily work.

Apply to Goldwind

Clera fills in Goldwind's application for you.

How it works

Open the role in Clera

Sign in, and this role opens on your Clera job board, ready to apply.

Clera fills in the application

Clera fills the form from your profile and resume, and asks what's missing.

Track it in Clera

Each application you send shows up in your Clera tracker, sorted by stage.

Want Clera to find roles for you?

Ask your AI about this role

It knows you. Clera gives it the role.

Does this role fit my profile?

First time? Connect Clera once, about a minute.
One click above pre-fills the connector. Or by hand: Settings > Connectors > Add custom connector, paste https://mcp.getclera.com. Either way, sign in with the account you use on Clera and approve the consent screen.
https://mcp.getclera.com

Sign in with your Clera account. MCP docs

About Goldwind

As a reliable global strategic partner in clean energy, Goldwind is committed to Driving a Renewable Future and centering its business on Ecology-Oriented Development+ENERGY industry model. Goldwind’s global business network covers more than 49 countries across 6 continents. We have approximately 11,000 employees worldwide, including more than 3,000 research and development (R&D) and technical personnel. With high quality clean energy products, solutions, devices, services, Goldwind supports cities and enterprises alike with comprehensive and sustainable economic, ecological, and social development. As of Q3 2025, Goldwind has delivered more than 56,800 wind turbines worldwide and boasts a global cumulative installed capacity exceeding 171+GW. Goldwind also has operations and maintenance (O&M) service capacity that exceeds 115GW.

Goldwind is Innovating for a Brighter Tomorrow.

Team size
10,001+ employees people
Founded
1998
Industry
Renewable Energy Equipment Manufacturing
Workplace
On-site
Locations
Beijing, Beijing, China