Global Graduate Program 2026-Mechanical Design Engineer
- Workplace
- On-site
- Employment
- Full-time
About this role
Job Responsibilities:
1. Under the guidance of mentors, participate in the design of wind power mechanical drive train systems, coupled design of gearbox/bearing transmission components, as well as calculation, verification and simulation.
2. Under the guidance of mentors, participate in the independent design and research of gearboxes.
Qualifications:
1. Majors in Mechanical Engineering; gear-related background is preferred.
2. Proficient in mechanical professional knowledge such as mechanical design and mechanical principles; familiar with mechanics knowledge including material mechanics and engineering mechanics.
3. Proficient in relevant software, common office software; familiar with common strength analysis software.
4. Experience in mechanical transmission projects (gear, etc.) is preferred.
Apply to Goldwind
Clera fills in Goldwind's application for you.
How it works
Open the role in Clera
Sign in, and this role opens on your Clera job board, ready to apply.
Clera fills in the application
Clera fills the form from your profile and resume, and asks what's missing.
Track it in Clera
Each application you send shows up in your Clera tracker, sorted by stage.
Ask your AI about this role
It knows you. Clera gives it the role.
First time? Connect Clera once, about a minute.
https://mcp.getclera.comSign in with your Clera account. MCP docs
About Goldwind
As a reliable global strategic partner in clean energy, Goldwind is committed to Driving a Renewable Future and centering its business on Ecology-Oriented Development+ENERGY industry model. Goldwind’s global business network covers more than 49 countries across 6 continents. We have approximately 11,000 employees worldwide, including more than 3,000 research and development (R&D) and technical personnel. With high quality clean energy products, solutions, devices, services, Goldwind supports cities and enterprises alike with comprehensive and sustainable economic, ecological, and social development. As of Q3 2025, Goldwind has delivered more than 56,800 wind turbines worldwide and boasts a global cumulative installed capacity exceeding 171+GW. Goldwind also has operations and maintenance (O&M) service capacity that exceeds 115GW.
Goldwind is Innovating for a Brighter Tomorrow.
- Team size
- 10,001+ employees people
- Founded
- 1998
- Industry
- Renewable Energy Equipment Manufacturing
- Workplace
- On-site
- Locations
- Beijing, Beijing, China